CP — Cruz Parmer
Available — VP / Head of Development Charlotte, NC · National

Cruz Parmer

Target role: VP / Head of Development · Permanent, full-time

I help CEOs and founders decide where to expand, how much to invest, and which franchise projects to move forward. I’ve led development teams, owned departmental P&L and capital budgets, and set clear checkpoints from lease negotiations through opening day.

The Plunge House cold plunge hall — a row of plunge tubs behind whitewashed slatted wood screens bearing the Plunge House mark, with floor-to-ceiling windows and exposed black ductwork
The Plunge House, delivered.Cold Plunge · Contrast Therapy
45Career openings delivered
75Portfolio — units
35Concurrent projects at peak
$12–15M+Annual capital deployed
280 daysAgreement to opening cycle

Scope matters: 45 is the career total across brands, 75 is the portfolio, and up to 35 projects ran concurrently at peak — not a single-brand snapshot.

01 — How I Lead

How I lead development

Growth and portfolio decisions

I weigh site economics and franchisee commitment when deciding which projects to advance or recover. At Sandhill, I recommended keeping the original site and renegotiated the terms that made it viable.

P&L and capital allocation

I owned departmental P&L and capital budgets. At Relentless Brands, I directed $12M–$15M+ in annual development and facilities capital and advised leadership on investment priorities and portfolio risk.

Site and lease economics

At Dogtopia’s Garden Home site, I negotiated approximately $489,000 in tenant improvement and landlord work allowances.

Team leadership and development systems

I led 4–7 direct reports and set checkpoints from letter of intent to closeout, including when tenant improvement allowances were claimed and when the claim package went to the landlord. That process helped me manage up to 35 concurrent projects.

Multi-site delivery and commercial partnerships

I coordinated 16 ISI openings and secured Hyperice as an official sponsor of The Plunge House, adding a recovery offering and a revenue stream.

02 — Selected Development Work

Selected development work

ISI Elite Training — Sandhill · Columbia, SC

Kept the franchisee at the original site and protected the investment

When the franchisee wanted out midway through construction in Columbia, South Carolina, I recommended keeping the original site. I secured roughly $140,000 in additional tenant improvement allowances and about 12 months of rent abatement. The franchisee recommitted, the location opened, and a roughly $90,000 lease buyout was avoided. The project finished roughly $45,000 net ahead despite a mid-project contractor default.

Relentless Brands — The Plunge House

Led the flagship design team and got the location open

As the sole point of direction for the design team, I helped bring an $878,000 preliminary construction estimate down to a $665,000 contract. I took over the build midstream, coordinated replacement vendors, and secured health department approval to meet the final opening date.

SweatHouz

Lowered buildout costs by changing how trades were purchased

I moved millwork and other scopes out of the general contractor’s contract and bought them directly, reducing buildout costs from $127 to $106 per square foot.

Interlude — In Pictures

The spaces I build

Photographed in the finished spaces — ISI Elite Training, Row House, Dogtopia, SweatHouz, and The Plunge House, delivered from LOI to opening day.

03 — The Proof

Cost leadership, documented

Not a claim — a board-reported result, with the contracts and pay apps behind it.

Cost per square foot

$127→$106 / SF

Cut by pulling scopes — including millwork — out of the GC contract and contracting directly with specialized vendors. Reported to the board March 20, 2023, as Director of Construction.

Brand-to-brand conversion — $45K net

$45K

A full Row House studio remodeled and converted into an ISI Elite Training — a complete brand-to-brand conversion delivered at $45K net cost. Reuse of the existing footprint and disciplined scope control, instead of a ground-up buildout. See the conversion case study

Liquidated damages recovered — Dogtopia Huntsville

$30K

Dogtopia — Huntsville, AL: $30K recovered in liquidated damages — the contract enforced as written when delivery slipped, with the damages collected back for the project.

Capital recovered & standardized

$5,684,537 gross buildout across 8 new units in the Prospect Hill rollup, against $1,345,143 in TI received.

SweatHouz FF&E standardized at $100,805 / unit — the same discipline on every opening: competitive bids, tight change-order control (including reversing a PCO and voiding a duplicate CO), and landlord dollars captured before signing.

Tenant improvement — collected in full

$134,294

$134,294 TI collected — 100% of the tenant improvement allowance, ISI Elite Training HQ. The full landlord allowance for the headquarters buildout was drawn and received — collected to the last dollar, not left unclaimed at close-out.

04 — Project Record

Project record

Documented projects with the figure attached. Filter by brand.

ProjectScopeDocumented figureNote
Dogtopia — Huntsville, ALLegacy Franchise Concepts7,954 SF · Ground-up / TI$906,594 GC
$940,640 total
$30K LD recovered
Beam Team contract. Completed Mar 24, 2023 — $30K recovered in liquidated damages.
Dogtopia — Garden Home, ORLegacy Franchise ConceptsFull buildout$1,420,801 contract
$932,224 net
Net after TI & landlord allowances.
SweatHouz — Preston Royal, Dallas, TXLegacy Franchise Concepts3-bid process$567,310 → $584,422After 3 PCCOs — change held to ~3%.
ISI — Tomball / Northpointe, TXRelentless BrandsFranchisee buildout$335,766 contractAIA Pay App #2: ~57% complete, Feb 29, 2024, 10% retainage.
Row House → ISI Elite TrainingRelentless Brands · Raleigh, NCRemodel · Brand-to-brand conversion$45K net costFormer Row House studio in Raleigh, NC converted into an ISI Elite Training — full remodel delivered at $45K net. See the case study
ISI — Cooper City, FLRelentless BrandsClose-out12-item punch listFormal punch list issued Dec 16, 2025 with franchise partner.
Relentless Brands HQISI / The Plunge HouseLandlord TI draw$67,147 drawn50% of $134,294 TI — invoiced Apr 30, 2024.

Showing all projects.

05 — Negotiation

Lease wins

The negotiation is where the margin is made — before construction ever starts.

Buffalo Grove, IL · Signed Feb 28, 2024

Exclusive use with teeth

2,570 SF former F45 at $32.00/SF. If the landlord violates exclusivity: 50% rent, termination after 12 months, and reimbursement of unamortized TI + design fees. Plus 30 days' base rent abatement.

Plaza del Lago, CA

$28 / SF in TI

4,616 SF at $32.00 PSF with $28.00/SF TI. Negotiation cut the guarantee from 5 years to 3 and added 4 months at $0 rent + 120 days' abatement after rent commencement.

Westerville, OH · Hondros Crossing

Five rounds, 2-for-1 penalty

2,765 SF at $31.00/SF after five rounds of counters (Jan–Mar 2024). Late delivery costs the landlord 2 days' rent abated for every 1 day late.

ISI Sandhills

Recovered after GC default

~$140K TI + ~12 months free rent negotiated, then ~$75K in damages pursued after GC default — ~$45K net recovered for the project.

ISI Creekside

Contingency returned

~$60K in contingency returned — budget discipline held through close-out instead of being spent because it was there.

Irvine, CA · Orchard Hills

Zoning cleared in writing

City confirmed ISI classifies as a “commercial school” — permitted by right, parking at 1 per 222 SF, no planning approval needed. De-risked before the lease was signed.

Case Study — ISI Elite Training · Sandhill

From Lease Exposure to Project Control

Columbia, South Carolina. Lease strategy, landlord leverage, contractor documentation, and construction recovery protecting owner capital.

12 MonthsRent abatement negotiated
$140K+Additional TI funding secured
Exit AvertedOwner wanted out mid-build — kept in the deal
Owner CapitalProtected through documentation & execution

The project was at risk before it opened.

ISI Elite Training Sandhill was not a routine fitness build-out. The project became a complex development challenge involving lease exposure, landlord negotiations, contractor performance issues, disputed payment demands, and construction recovery. Halfway through the build — after the first 50% of the tenant improvement funding, roughly $110,000, had already been received — the franchise owner wanted out of the lease. He wasn't fully sold on the location and wanted a different site in a better complex instead. I stayed in his corner through the exit attempt — including advising him to form a second LLC to shield his assets in case the landlord pursued him for defaulting on the lease. The second property never got signed, so the owner came back to the original site and construction restarted.

Back room at ISI Sandhill during construction recovery — black tile wall in, one wall still bare concrete, and lumber stacked at the far end
Back-of-house mid-recovery — materials staged and stored on site while the project's future was still being negotiated.

The landlord's real incentive created leverage.

Through direct conversations with the landlord, I identified the larger business driver: preserving signed leases to support the broader value and marketability of the shopping center. Once that was understood, the negotiation strategy changed. The project was repositioned around what the landlord actually needed — an active, committed tenant that supported the value of the development. That leverage produced the package that kept the owner in the deal: $140K+ in additional TI and roughly 12 months of rent abatement.

ISI Sandhill training floor during construction — ceiling grid and lighting finished, flooring going down, and materials staged across the open floor
The training floor mid-build — field photos like this one became part of the project record behind every negotiation.

Documentation became the negotiating weapon.

As contractor-related disputes escalated, the project record became one of the most important assets. Communications, field photos, scope status, payment history, punch items, and performance issues were organized to support the owner's position. The result was a more controlled outcome driven by evidence, not emotion. That record is why a replacement GC brought in on a roughly $75K scope — substantially late, with scope left incomplete — was paid nothing. It also exposed the original GC, Beam Team, which had claimed rough-in and final inspections had passed when they had not; the owner sued Beam Team as well.

Project recovery timeline

The Challenge

  • Lease exposure
  • Owner wanted out of the lease
  • Contractor performance issues
  • Capital and timeline risk

The Approach

  • Identified landlord objective
  • Repositioned negotiation
  • Second-LLC asset protection advised
  • Documented field conditions
  • Maintained recovery oversight

The Outcome

  • 12 months rent abatement
  • $140K+ additional TI
  • Owner kept in the deal
  • Replacement GC paid $0 — original GC sued
  • Project stabilized

Capital Protected. Project Stabilized.

The Sandhill project was stabilized through strategic negotiation, disciplined documentation, and hands-on construction leadership. This was not just a construction project. It was a capital preservation and project recovery assignment.

Case Study — Row House → ISI Elite Training · Raleigh, NC

From Row House to ISI Elite Training

Raleigh, North Carolina. An operating Row House rowing studio remodeled and converted into an ISI Elite Training — same footprint, new brand, delivered at $45K net cost.

$45KNet cost of the full conversion
Raleigh, NCFormer Row House studio
Brand-to-BrandRow House out — ISI Elite Training in
Existing FootprintReused — no ground-up buildout

Before & after

Row House studio in Raleigh, NC as found — rower rows under purple light facing the gold W on the back wall, shot from the coach platform
Before — Row House · Raleigh, NC

The studio as found

The Row House studio as found — rower rows under the gold W, shot from the coach platform.

The converted Raleigh studio as an ISI Elite Training — open rubber training floor, black turf lane with the ISI Elite Training mark inlaid in the foreground, square LED ceiling panels overhead
After — ISI Elite Training · Raleigh, NC

The training floor, converted

The same Raleigh studio after conversion — the rower fleet and coach platform out, an open training floor in, with the turf lane and the ISI mark set into it.

Row House front desk in Raleigh, NC as found — check-in tablets on the white counter with the studio entry behind
Before — Row House · Raleigh, NC

Check-in, Row House style

The Row House front desk as found — check-in tablets on the white counter, the entry opening behind it.

Front of house at the converted ISI Elite Training in Raleigh, NC — the white curved reception desk with the member locker bank behind it and the storefront entry to the left
After — ISI Elite Training · Raleigh, NC

Front desk & entry

The front of house in the converted space — the white curved reception desk carried into the ISI layout, member lockers banked behind it, storefront glass at the entry.

Row House studio in Raleigh, NC lit in blue — rows of Concept2 rowing machines facing large W wall graphics
Before — Row House · Raleigh, NC

Blue-lit rows

The studio under Row House's blue class lighting — fixed rower rows facing the W wall graphics.

Turf lane at the converted ISI Elite Training in Raleigh, NC — the ISI logo and Elite Training lettering inlaid in black turf running the length of the studio, dumbbell rack at the far end
After — ISI Elite Training · Raleigh, NC

Turf lane in

ISI's turf lane in place of the fixed rower rows — the ISI mark inlaid in the black turf, running the length of the converted studio.

Row House motivational word wall in Raleigh, NC — 'Row House, Further Together' and 'Every Seat Counts, Every Stroke Matters' lettering behind Concept2 rowers
Before — Row House · Raleigh, NC

The quote wall

“Further Together” — Row House branding across the back wall, over the rower fleet.

Converted ISI Elite Training floor in Raleigh, NC — black turf lane with the ISI Elite Training logo inlaid, dumbbell rack on the turf, and the large class screen mounted on the gray wall
After — ISI Elite Training · Raleigh, NC

The screen wall, ISI format

Where the quote wall stood — the ISI turf lane below and the large class screen mounted on the two-tone wall, the studio laid out for class throughput.

Row House studio in Raleigh, NC beneath the large hanging illuminated Row House screen — rows of rowing machines and the W wall graphics beyond
Before — Row House · Raleigh, NC

Under the big screen

The illuminated Row House screen hanging over the studio, rower rows stretching out beneath it.

The converted ISI Elite Training studio in Raleigh, NC in one wide view — open rubber training floor, black ceiling with square LED panels and fans, turf lane and class screen at the far end
After — ISI Elite Training · Raleigh, NC

The floor, finished

The full converted studio in one view — rubber training floor under the black ceiling grid, turf lane and screen wall at the far end, ready for opening.

The converted studio — photographed on site

As found — and the plan

What Came Out

  • The Concept2 rowing fleet and the raised coach platform
  • Row House branding — the slogan walls, W graphics, and the big illuminated screen
  • The blue class-lighting scheme

What Was Reused

  • The existing footprint and shell — no ground-up buildout
  • The open studio floor, kept as the training floor
  • The storefront glass and entry sequence

What Went In

  • ISI Elite Training floor — turf lane with the ISI mark inlaid, rigs, and racks
  • Two-tone ISI walls, black ceiling grid, and the large class screen
  • The white front desk and reception setup, lockers carried through
  • Restrooms refinished — wave tile, charcoal walls, new fixtures

Same footprint. New brand.

The Raleigh conversion took a single-brand rowing studio and delivered a full ISI Elite Training inside the same walls for $45K net — the cheapest square footage is the space you already have, converted with discipline instead of rebuilt from scratch.

Case Study — The Plunge House · Charlotte, NC

Took Over Mid-Project. Drove It to Completion.

The Platform, 3216 South Blvd Unit 202, Charlotte, NC 28209 (South End). The corporate flagship for a contrast-therapy concept — plunge room, saunas, and locker rooms on the second floor of a new mixed-use building, on a 10-year lease at $40/SF with landlord Investicore.

2,878 SFThe Platform — South End flagship
$201,460Tenant improvement allowance captured
$665KConstruction contract
101 ItemsPunch list driven to completion

He owned the design direction, not just the closeout.

Cruz created the design intent package for the Plunge House concept. That package set the direction for the flagship build — the plunge room, saunas, and locker rooms — before he later became the person responsible for forcing the project across the finish line. His role on this project was design direction and, from mid-build onward, sole direction for the design team and the site.

The Plunge House dimensional logo wall — white lettering on a matte navy wall with brass peg detailing and a boucle bench
The Plunge House brand wall — the design intent carried through to the finished flagship interior.

Five bids came in high. Three VE rounds reset the contract.

Five GC bids leveled at $869K–$1,115K against an $878K preliminary budget. In January 2024, three value-engineering rounds cut the construction contract from the $878K preliminary estimate to a $665K lump sum — a 24.3% reduction on the construction contract. The GC fee was negotiated down from ~$80K to $65K. Net construction after TI: $463,540. The full $201,460 TI allowance was captured, with the 50% draw ($100,730) invoiced in April 2024. Increased vendor rebates by $5,000 per project across 16 projects ($80,000 total) by bringing on his own architect. Generated a 3% vendor rebate on lighting purchases, running ~$2,000 per quarter, and flat $1,000-per-project AV/IT vendor rebates across 16 projects ($16,000 total) by bringing on his own vendors.

Cedar sauna interior at The Plunge House — horizontal cedar paneling, tiered benches, and a traditional sauna bucket and ladle
The cedar sauna at the Charlotte flagship — one of the owner-furnished elements procured directly for the build.

The build kept moving through mid-stream changes.

Fire Marshal-driven fire-alarm additions were absorbed mid-stream. A twinned-furnace HVAC solution avoided a $10,000 change order. Owner-furnished tubs, saunas, and an ADA lift were procured directly — keeping critical contrast-therapy equipment on the owner's timeline rather than the GC's.

The takeover: punch list, termination, lockout.

The prior project manager departed mid-build. From May 2024, Cruz was the design team's sole direction point. He walked the site May 19 and issued a 101-item punch list on June 4 with a five-day deadline and a documented $2,000/day delay cost. He issued a Notice of Termination for Cause on June 9, 2024, and personally locked the GC out of the site, finishing the build on site around the clock with new owner-direct vendors. When the GC refused scope, Cruz drafted owner-side liability releases so the work could proceed.

The Challenge

  • Five GC bids at $869K–$1,115K vs. $878K prelim budget
  • Fire Marshal-driven fire-alarm additions mid-build
  • Prior project manager departed mid-build
  • Repeated grand-opening postponements

The Approach

  • Design intent package created by Cruz
  • Three VE rounds — January 2024
  • Twinned-furnace HVAC solution
  • Owner-direct procurement — tubs, saunas, ADA lift
  • 101-item punch list with five-day deadline

The Outcome

  • $665K construction contract — $463,540 net after TI
  • $201,460 TI allowance captured in full
  • GC terminated for cause — site finished owner-direct
  • Health department sign-off secured to open
  • Staffed and operating into late 2025

The Final Date Held. He Made It Happen.

After repeated grand-opening postponements, Cruz personally drove the final opening date and made it — including personally securing the health department sign-off to open, required for the cold plunge operation. The club was staffed and operating into late 2025, with Cruz still managing its vendor and warranty items.

06 — Fractional

Fractional Development Leadership

I take on select fractional engagements for emerging brands that need development leadership before they can support a full-time hire.

Paid 90-day pilot

The pilot is structured as a monthly retainer for three months.

Discuss a fractional engagement
  • Days 1–30. Diagnose the pipeline and identify risks and priorities.
  • Days 31–60. Install the development process and reporting.
  • Days 61–90. Run the process, report results, and make a mutual decision about continuing.

07 — Experience

The record

Cruz Parmer is a development executive based in Charlotte, NC, and open to relocating nationally for a permanent VP / Head of Development role. His recent leadership experience includes Relentless Brands, supporting ISI Elite Training and The Plunge House, and Legacy Franchise Concepts, supporting SweatHouz and Dogtopia.

Director of Real Estate & Construction — Relentless Brands

ISI Elite Training & The Plunge House. Site selection, LOIs and leases, design, construction, and openings across a national franchise pipeline.

Executive Director of Construction & Facilities Maintenance — Legacy Franchise Concepts

SweatHouz and Dogtopia. Board reporting, cost-per-SF program, FF&E standards, multi-state buildouts and facilities.

MEYN · Fry Reglet · DEX · Paul Davis

12 years across architecture & planning and construction — including 2 years as an F&B construction PM — the base for the integrated real estate + construction approach.

B.B.A., Business Economics & Management — Georgia State University

Based in Charlotte, NC. Willing to relocate nationally for the right role.

08 — Testimonial

In their own words

From clients who opened their first fitness business with Cruz guiding the lease, the build-out, and everything in between.

When we began the process of opening our fitness business, we quickly realized how complex commercial real estate, lease negotiations, and facility development could be. Having Cruz guide us through the process was invaluable.

From the very beginning, Cruz brought a level of knowledge, persistence, and professionalism that gave us confidence every step of the way. He played a critical role in negotiating our lease, helping us secure favorable terms while protecting our interests. His expertise also helped us identify opportunities to reduce costs during the build-out process, ultimately saving us money without compromising the quality of our business.

What stood out most was Cruz’s determination and commitment to helping us succeed. Whenever challenges arose, he remained engaged, solution-oriented, and relentless in pursuing the best possible outcome. His experience and understanding of the process helped us avoid costly mistakes and make informed decisions throughout the project.

Opening a business of this scale is no small undertaking, but Cruz’s guidance and advocacy helped make our vision a reality. We are incredibly grateful for his support and would highly recommend him to anyone looking for a trusted professional who truly goes above and beyond for his clients.

— Rebecca & Mike Former Fitness Business Owners

09 — Questions

VP of Development, explained

What the role is, who Cruz Parmer is, and the record behind the full-time VP / Head of Development search.

Who is Cruz Parmer?

Franchise real estate & construction — VP of Development candidate

Cruz Parmer is a development executive based in Charlotte, NC with 12+ years across franchise fitness, wellness, and multi-unit retail, available for VP / Head of Development roles. Most recently Director of Real Estate & Construction at Relentless Brands (ISI Elite Training, The Plunge House) and Executive Director of Construction & Facilities Maintenance at Legacy Franchise Concepts (SweatHouz, Dogtopia). Record: 45 openings, 75-unit portfolio, up to 35 concurrent projects, $12–15M+ annual capital.

What a VP of Development does

LOI to grand opening, as one system

A VP of Development owns growth end-to-end: site selection, LOI and lease negotiation, design, permitting, GC and vendor contracting, construction, and opening. Cruz runs a 10-phase system with a 280-day agreement-to-opening cycle — so real estate, construction, and openings never fall between departments.

Documented results

Numbers that trace to contracts & board reports

Construction cost cut from $127 to $106 per SF. $134,294 TI collected in full for ISI HQ. ~$140K additional TI + ~12 months free rent at ISI Sandhills. A Row House → ISI conversion delivered at $45K net. $30K liquidated damages recovered at Dogtopia Huntsville.

Fractional engagements

Fractional development leadership, by pilot

For emerging brands that need development leadership before they can support a full-time hire, Cruz takes on select fractional engagements through a paid 90-day pilot — diagnose the pipeline, install the process, then run it and decide together about continuing. His primary search remains a permanent, full-time VP / Head of Development role. See Fractional Development Leadership.

10 — Contact

Let's talk

My primary search is a permanent, full-time VP / Head of Development role. Fastest is a call or email — based in Charlotte, open to relocating nationally.

Portrait of Cruz Parmer in a navy suit and white open-collar shirt

Cruz Parmer

Development executive based in Charlotte, NC, and open to relocating nationally for a permanent VP / Head of Development role. Recent leadership includes Relentless Brands — ISI Elite Training and The Plunge House — and Legacy Franchise Concepts — SweatHouz and Dogtopia.

Email copied